- ページ 5

ペディキュア・スパ AYC Group LS-5000BのPDF オーナーズマニュアルをオンラインで閲覧またはダウンロードできます。AYC Group LS-5000B 9 ページ。

Connect the floor drain connection to the P-trap (if you are using a wall drain you will
need to install an optional discharge pump).
Connection: P-trap 1½-inch drain pipe
Place the drain plug into the drain from the top of the drain (the drain plug may need to
be adjusted so that the drain plug forms a tight seal around the drain).
Install the faucet handle by inserting it into the faucet in front with the red and blue
indicator facing up. Then, tighten the lock screw with a small flathead screwdriver.
Attach the sprayer to the sprayer hose (be sure to cut the zip tie around the sprayer
hose).
Plug the power cord into a GFCI outlet.
Operating the Pedicure Spa
After the spa has been installed and the plumbing and electrical connections have been
made, clean the tub with AYC Group spray and wipe dry with a clean towel.
Follow these instructions to test the pedicure spa:
1. Turn the "drain handle" counter-clockwise to close the drain.
2. Fill the tub to the "water fill line" using warm water by lifting the lever upward.
3. Turn the "on/off switch" to the "on" position. This will turn the whirlpool pump on.
4. Check for leaks underneath the spa.
5. Push the "whirlpool on/off switch" to the "off" position. This will turn the whirlpool
pump off.
6. Turn the "drain handle" clockwise to open the drain.
Note: If the discharge pump is not used, the water will drain out automatically;
otherwise follow steps 7 & 8 to complete the water draining.
1
6
3
Drain lever, On/Off, Faucet lever
2
5