- ページ 12

スイッチ Cisco 3020 - Cisco Catalyst Blade SwitchのPDF インストレーション・マニュアルをオンラインで閲覧またはダウンロードできます。Cisco 3020 - Cisco Catalyst Blade Switch 21 ページ。 Release notes for the cisco catalyst blade switch 3020 for hp, ciscoã‚â iosã‚â releaseã‚â 12.2(44)se
Cisco 3020 - Cisco Catalyst Blade Switch にも: スタートマニュアル (37 ページ), スタートマニュアル (31 ページ), クイックスペック (12 ページ), リリースノート (41 ページ), リリースノート (27 ページ), リリースノート (23 ページ), リリースノート (21 ページ)

Cisco 3020 - Cisco Catalyst Blade Switch インストレーション・マニュアル
Running Express Setup
The Express Setup home page appears. (See
Figure 2-7
Step 11
Go to
using the Express Setup screen of the Device Manager.
Using the Onboard Administrator to Assign an IP Address to the Switch Module
fa0 Interface
For the switch module to obtain an IP address for the fa0 interface through the Onboard Administrator,
these conditions must be met:
See the Onboard Administrator user guide at
Note
more information about configuring and using the Onboard Administrator.
After you install the switch module in the interconnect module bay, after approximately 2 minutes, the
switch module automatically obtains an IP address for its fa0 interface through the Onboard
Administrator. This method of obtaining an IP address occurs if a DCHP server is configured on the same
network, or if the Onboard Administrator is configured as a DHCP server. If you prefer to use Express
Setup to assign the switch module IP address to the VLAN 1 interface, you must start the Express Setup
steps immediately after you install the switch module.
After you have installed the switch module (see the
section on page
that runs automatically to ensure that the switch module functions properly.
Cisco Catalyst Blade Switch 3020 for HP Hardware Installation Guide
2-12
Express Setup Page
"Completing the Express Setup Fields" section on page 2-14
The blade server is powered on and connected to the network.
Basic configuration of the Onboard Administrator is completed, and you have the username and
password for the Onboard Administrator.
A DHCP server is configured on the network segment to which the blade server is connected, or the
Onboard Administrator is configured to run as a DHCP server.
2-6), it powers on. As it powers on, the switch module begins the POST, a series of tests
Figure
2-7.)
to finish setting up the switch module
http://www.hp.com/go/bladesystem/documentation
"Installing the Switch Module in the Blade Server"
Chapter 2
Switch Installation
for
OL-8914-02