- ページ 18

サーバー Digital Equipment Prioris XL 6000 SeriesのPDF インストレーション・マニュアルをオンラインで閲覧またはダウンロードできます。Digital Equipment Prioris XL 6000 Series 19 ページ。 With pentium pro chip upgrade

Prioris XL 6000 Server PowerGrade

Run the System Configuration Utility (SCU)

Power up and boot your server from the SCU diskette. The SCU enables you
to check or change your server's configuration. Run the SCU to configure
your server for the new CPU chip or module.
To start and run the SCU:
1. Insert the SCU diskette into drive A and turn on your server. The diskette
should boot automatically.
2. When the SCU title appears, press any key to continue. Afterwards,
follow the instructions on your screen to access the SCU main menu.
3. From the main menu, press the up or down arrow to highlight an item and
then press Enter to select it. Press F1 at any time for help about a
selection.
4. From the main menu select Configure Computer and then View
and Edit Details. Example:
If you installed a video option card, select the Advanced Control
Group and disable the Embedded - PCI VGA controller.
5. Select Save and Exit to configure your server for the CPU module.
6. When complete, remove the SCU diskette from drive A.
7. Move the video cable to the newly installed video card (if you have one)
and reboot your server.
Refer to Chapter 2, "Server Software and Utilities," in your computer System
Reference Guide for any additional information on running the SCU.
12