- ページ 11
産業機器 Siemens SITRANS WW200のPDF 取扱説明書をオンラインで閲覧またはダウンロードできます。Siemens SITRANS WW200 36 ページ。 Weighfeeders
Installing
Note
When lifting the weighfeeder, connect to the structural frame, and follow local governing code
for lifting/hoisting.
Perform a thorough and systematic inspection of containers immediately upon receipt of your
Siemens weighfeeder. The containers are packed to separate each item and provide protection
during shipping.
Note
Do not remove equipment from shipping crates or boxes until you check for possible shipping
damage. Contact the carrier immediately if damage is noted.
Your weighfeeder has been designed, assembled, and factory tested for your specific
application.
Note
● The frame of the weighfeeder needs to be grounded to ensure accurate signal processing
to the integrator.
● Do NOT remove the tagged load cell shipping bolt(s) until the installation is complete to
prevent load cell damage.
● Do NOT weld on or near the weighfeeder while the load cell is connected to the electronic
integrator. Damage to the integrator may result if the load cell is not disconnected from the
integrator.
● Follow a scheduled, preventative maintenance program to ensure optimum performance
and long equipment life.
4.1
Installation steps
Note
● Only qualified personnel are authorized to install and operate this equipment. Installation
shall be in accordance with local regulations, standards and established safety practices.
Read and understand the instructions before installing, operating or maintaining the
equipment.
● Flexible in-feed connections are REQUIRED for all applications. Flexible discharge
connections are also recommended.
SITRANS WW200
Operating Instructions, 06/2018, A5E33560654-AC
4
11