- ページ 36

産業機器 Siemens SIWAREX WL230 BB-S SAのPDF 設備マニュアルをオンラインで閲覧またはダウンロードできます。Siemens SIWAREX WL230 BB-S SA 50 ページ。 Base plate and elastomer bearing bb-s sa
Siemens SIWAREX WL230 BB-S SA にも: マニュアル (36 ページ), 取扱説明書 (48 ページ), 取扱説明書 (44 ページ)

Siemens SIWAREX WL230 BB-S SA 設備マニュアル
Installation

5.4 Dismantling

3. Rotate the top hexagon nuts downward.
4. To prevent the top hexagon nuts from turning upward in case of vibrations, fasten the top
hexagon nuts against the lower hexagon nuts.
Result
All top plates are resting on the load cells by means of the pendulum bolt. The load cells are
loaded.
5.3.6

Fixing of second guide element

Fix the second guide element analogous to the description in Chapter Fixing of guide element
(Page 35).
5.3.7

Checking the installation

Procedure
• After installation, make sure that the pivot heads of the turnbuckles can be moved by hand.
The pivot heads must not be tensioned.
5.4
Dismantling
For dismantling the load cells, the same safety rules (Page 25) apply as for installation.
1. Disconnect all the supply voltages and auxiliary voltages.
2. Secure the load carrier against falling.
3. Use appropriate hoisting gear and tools.
4. Take the load off the load cell.
5. Carefully remove the load cell without using force. Do not pull on the cable of the load cell.
6. If you intend to reinstall the load cell or send it for repair, do not cut the load cell cable.
7. Do not carry the load cell by the cable.
36
Equipment Manual, 12/2020, A5E02390707B-03
SB-S SA