- ページ 23

産業機器 Siemens UROSKOP DのPDF その他の設置、操作、メンテナンスに関する説明をオンラインで閲覧またはダウンロードできます。Siemens UROSKOP D 26 ページ。

Siemens UROSKOP D その他の設置、操作、メンテナンスに関する説明
Inspection and maintenance
PMF
Cassette transport
Load a 43 x 35 cm cassette vertically.
Visually check the loading mechanism for smooth, even movement.
NOTICE
Unload the cassette. You must be able to remove the cassette easily from the cassette
compartment.
Press the load switch to test the loading mechanism without a cassette,
- the clamping arms may not oscillate in the minimum opening position,
- safety limit switch s57 should not respond in the maximum opening position.
If necessary, recalibrate the reference switch s 51 (refer to Adjustment Instructions
RLL5-310.071.01.., chapter 8, page 8-3).
2.9

Component quality inspection

QIQ
Tomography (Uroskop D2/D3 only)
for systems with tomographic device only (UROSKOP D2/D3)
Check the tomographic device by releasing exposures, in accordance with Adjustment
Instructions RLL5-310.071.01.02.01, chapter 4, page 4-3.
2.10

Care

PMP
System
Switch the system OFF prior to cleaning or disinfecting.
PMP
Displays and indicators
Wipe off all indicators with a damp cloth or cotton wadding. Use water or a lukewarm
solution consisting of water and a household cleaner to dampen the cloth.
Do not use abrasive cleaners, (due to possible material incompatibility) organic cleaners
or cleaning agents containing organic substances (e.g. benzine, alcohol, spot remover).
Siemens AG
Medical Engineering
The guide rails do not always raise the cassette on the right side
of the spot film device ; only under certain circumstances.
RLL5-310.101.02
Rev. 02
01.97
Page 15 of 16
TDSP 1
2 - 15
UROSKOP D