- ページ 8
IP電話 Cisco 8000 SeriesのPDF インストールの準備をオンラインで閲覧またはダウンロードできます。Cisco 8000 Series 10 ページ。 Ip phones with multiplatform firmware
Cisco 8000 Series にも: インストレーション・マニュアル (39 ページ)
Prepare Yourself
Prepare Yourself
This section illustrates how to prepare yourself before removing the chassis from the sealed antistatic bag.
The figures show how to cuff the ESD strap around the wrist and the ground cord that connects the cuff to
the ground. ESD wrist straps are the primary means of controlling static charge on personnel.
Figure 2: Wearing the ESD Strap
Prepare Rack for Chassis Installation
Install the Cisco 8800 Series Routers on a standard 19 inch, Electronic Industries Alliance (EIA) rack with
mounting rails that conform to English universal hole spacing according to Section 1 of the
ANSI/EIA-310-D-1992 standard.
The spacing between the posts of the rack must be (EIA-310-D-1992 19-inch rack compatible) wide enough
to accommodate the width of the chassis.
Before you move the chassis or mount the chassis into the rack, we recommend that you do the following:
Prepare for Installation
8
Prepare for Installation