- ページ 3

コピー機 Ricoh B125のPDF サービスマニュアルをオンラインで閲覧またはダウンロードできます。Ricoh B125 14 ページ。

INSTALLATION
1. INSTALLATION PROCEDURE.................................................... 1-1
1.1 PREPARATION.........................................................................................1-1
1.1.1 ENVIRONMENT ...............................................................................1-1
1.1.2 MINIMUM SPACE REQUIREMENTS...............................................1-2
1.1.3 MACHINE LEVEL .............................................................................1-2
1.1.4 POWER SOURCE............................................................................1-3
1.1.5 INSTALLATION OVERVIEW............................................................1-4
Installation Flow ....................................................................................1-4
SP and User Tool Settings Required for Installation .............................1-5
1.2 COPIER INSTALLATION ..........................................................................1-6
1.2.1 ACCESSORY CHECK......................................................................1-6
1.2.2 COPIER PRE-INSTALLATION PROCEDURE .................................1-7
Removing the Shipping Material ...........................................................1-7
Set the Operation Panel Position ..........................................................1-8
Setting the Copier on the Roll Feeder or Table.....................................1-9
Leveling the Copier and Attaching Leg Covers...................................1-12
Developer ...........................................................................................1-14
Toner Cartridge and ID Sensor Initialization .......................................1-16
1.2.3 INSTALLATION SP SETTINGS .....................................................1-18
Using the SP Mode .............................................................................1-18
SP1960: Optional Paper Settings .......................................................1-19
SP1920: Cut Length Adjustment (for Roll Feeder)..............................1-19
Select the Paper Size and Type with User Tools ................................1-20
Select "Architecture" or "Engineering" (NA Only) ................................1-20
SP4960 015, 003 Enable and Format the HDD ..................................1-21
SP5137 Stamp Function On/Off .........................................................1-21
1.2.4 COPIER FINAL INSTALLATION PROCEDURE ............................1-22
Copy Trays, Guides, Original Exit Selection Lever .............................1-22
Copy Check ........................................................................................1-23
1.2.5 MOVING THE COPIER ..................................................................1-23
1.3 ROLL FEEDER INSTALLATION .............................................................1-24
1.3.1 ACCESSORY CHECK....................................................................1-24
1.3.2 ROLL FEEDER INSTALLATION PROCEDURE ............................1-25
Setting the Copier on the Roll Feeder.................................................1-25
Leveling the Copier and Attaching Leg Covers...................................1-25
Opening the Roll Feeder and Removing Shipping Material ................1-25
Attaching the Swinging Guide Plates ..................................................1-26
Connecting the Copier and Roll Feeder..............................................1-27
Attach the Mylars to the Copier...........................................................1-30
Attach the Mylars to the Back of the Roll Feeder ................................1-31
Installing the Paper Rolls ....................................................................1-31
SM
B125
TABLE OF CONTENTS
i
B125