- ページ 11

ネットワーク・ルーター Cisco uBR924のPDF インストールとスタートアップをオンラインで閲覧またはダウンロードできます。Cisco uBR924 34 ページ。 Cable access router

Initialize the Router
View Initialization
When the router is connected and powered on, it executes automatic self-diagnostic and installation procedures.
For this to occur, a number of actions must be performed at the headend. Refer to the "Prepare for Installation"
section of this guide. The initialization process follows:
All LEDs on the front of the router light (except for the ACT LED and LEDs 1 through 4) when the router
first powers on.
Different LEDs light to indicate diagnostic progress and turn off after all checks are successful.
The OK LED then blinks as the router completes self-test and boots a Cisco IOS image.
The router, in accordance with DOCSIS, acquires a downstream channel, establishes communications with
the headend, and downloads a configuration file (and an optional updated image if set).
When the download is complete, the following LEDs light and remain solid to indicate the router is
operational:
— DS LED reveals the router is locked to a downstream channel.
— US LED reveals the upstream channel is operational.
— LINK LED reveals the cable interface is operational.
— DSNR LED reveals the router is receiving a good downstream signal-to-noise ratio.
OK
ACT
1
2
3
4
CATV
LINK
V OK
V1
V2
DS
MSG
US
DSNR
Cisco uBR900
SERIES
9