- ページ 28
ネットワーク・ハードウェア Cisco ASR 9906のPDF マニュアルをオンラインで閲覧またはダウンロードできます。Cisco ASR 9906 44 ページ。 Replacing cisco asr 9000 series router components
- 1. Field Replaceable Units
- 2. Online Insertion and Removal
- 3. Powering off the Router
- 4. Replacing the Chassis Air Filter
- 5. Required Tools and Equipment
- 6. Removing a Fan Tray
- 7. Installing a Fan Tray
- 8. Disconnecting AC Power
- 9. Reconnecting AC Power
- 10. Disconnecting DC Power
- 11. Reconnecting DC Power
Migrating from RP1 to RP2 Card
• The router must be running Cisco IOS XR software release 5.3.2 or later version.
• The router must have two RP1 cards (active and standby) up and running.
• Cisco ASR 9000 Ethernet Line Card (first generation) must be removed from the chassis as they are
incompatible with RP2.
• Cisco ASR 9000 High Density 100GE Ethernet line cards must be power down or temporarily removed
before starting the migration procedure. Use the hw-module power disable location node-id command
in admin-config mode to power down the LC.
Procedure
Step 1
Use the show redundancy summary command to verify that the RP0 and RP1 are in Ready State.
Example:
Router# show redundancy summary
Wed Jun 17 11:18:51.391 PST
Active/Primary Standby/Backup
-------------- --------------
0/RP0/CPU0(A)
0/RP0/CPU0(P)
Router# show redundancy
Wed Jun 17 11:20:19.086 PST
Redundancy information for node 0/RP1/CPU0:
==========================================
Node 0/RP1/CPU0 is in ACTIVE role
Node Redundancy Partner (0/RP0/CPU0) is in STANDBY role
Standby node in 0/RP0/CPU0 is ready
Standby node in 0/RP0/CPU0 is NSR-ready
Node 0/RP1/CPU0 is in process group PRIMARY role
Process Redundancy Partner (0/RP0/CPU0) is in BACKUP role
Backup node in 0/RP0/CPU0 is ready
Backup node in 0/RP0/CPU0 is NSR-ready
Group
---------
v6-routing
mcast-routing
netmgmt
v4-routing
central-services
dlrsc
dsc
Active node reload "Cause: Initiating switch-over."
Standby node reload "Cause: Initiating switch-over."
Step 2
Remove the standby RP1 card and insert RP2. Follow the procedure explained in the topic
Replacing Cards from the Chassis, on page
Step 3
Connect to RP2 console port and type CTRL+C to break into ROMMON.
Step 4
From the ROMMON prompt of RP2, set ROMMON variable to activate 1GE mode for peer RP communication:
Example:
Replacing Cisco ASR 9000 Series Router Components
28
0/RP1/CPU0(S) (Node Ready, NSR: Ready)
0/RP1/CPU0(B) (Proc Group Ready, NSR: Ready)
Primary
Backup
---------
--------- ---------
0/RP1/CPU0
0/RP0/CPU0
0/RP1/CPU0
0/RP0/CPU0
0/RP1/CPU0
0/RP0/CPU0
0/RP1/CPU0
0/RP0/CPU0
0/RP1/CPU0
0/RP0/CPU0
0/RP1/CPU0
0/RP0/CPU0
0/RP1/CPU0
0/RP0/CPU0
25.
Replacing Cisco ASR 9000 Series Router Components
Status
Ready
Ready
Ready
Ready
Ready
Ready
Ready
Removing and