- ページ 8

ネットワーク・ハードウェア Cisco CE 2000 Platform SCE 2000 4xGBEのPDF クイック・スタート・マニュアルをオンラインで閲覧またはダウンロードできます。Cisco CE 2000 Platform SCE 2000 4xGBE 29 ページ。 Service control engine

Mounting the System to the Rack

When the appropriate mounting brackets are securely installed, the SCE 2000 can be installed into the rack.
Make sure that the rack brakes are locked or that the rack is otherwise stabilized.
Caution
Slide the SCE 2000 into the rack, pushing it back until the brackets (installed at the front of the unit) meet the mounting
Step 1
strips or posts on both sides of the rack.
Figure 8
Sliding the SCE Platform into the Rack
PWR A
PWR B
STATUS
BYPASS
Cisco SCE
MNG 1
MNG 2
2000
LINK/
10/100/
CONSOLE
AUX
LINK RX
TX
4xGBE
Series
ACTIVE
1000
LINK/
ACTIVE
10/100/
1000
LINK RX
TX
LINK RX
TX
RX
MM
LINK RX
TX
TX
RX
MM
TX
RX
MM
TX
GBE-1
RX
MM
TX
SUB
LINE
NET
SUB LINE/CASCADE
GBE-2
NET
PW R A
PW R B
STA TUS
BYP ASS
MN G 1
MN G 2
CO NSO LE
AU X
LINK /
10/1 00/
ACT IVE
LINK /
1000
10/1 00/
ACT IVE
1000
1
A rack with both front and back posts will have the crossrail supports installed. Slide the SCE 2000 onto these crossrails
and push it all the way back.
8
C is co SC
E 20 00
Se rie s
LINK RX
4x G BE
TX
LINK RX
TX
LINK RX
TX
LINK RX
TX
RX
MM
TX
RX
MM
TX
RX
MM
TX
RX
MM
GBE -1
TX
SUB
LINE
NET
GBE -2
SUB LINE
/CA SCA DE
NET
2
3