- ページ 7
サーバー Cisco 7513 SeriesのPDF 交換取扱説明書をオンラインで閲覧またはダウンロードできます。Cisco 7513 Series 22 ページ。 Chassis replacement
Cisco 7513 Series にも: クイック・スタート・マニュアル (44 ページ), 交換取扱説明書 (26 ページ), データシート (11 ページ), マニュアル (30 ページ), 維持 (20 ページ), 交換取扱説明書 (19 ページ)
Tools and Parts Required
This section lists the tools and parts you will need to complete these replacement procedures. Have
the necessary tools on hand so that you can complete the replacement without interruption:
•
To replace the chassis cover, you need a 3/16-inch, flat-blade screwdriver to loosen the captive
screws on the chassis cover panel
•
To install a replacement chassis, you need a number 1 Phillips and a 3/16-inch, flat-blade
screwdriver for the captive installation screws on the processor modules (most of the carriers use
slotted screws, but some use Phillips screws)
•
To install a new cable-management bracket or to move the bracket from the existing chassis, you
need the following tools and parts (panhead screws are included with the brackets):
— Number 1 Phillips screwdriver
— Cable-management bracket
— Two M3 x 8-mm, Phillips panhead screws
•
If you plan to mount or replace the chassis in an equipment rack, you also need the following
tools:
— Number 2 Phillips screwdriver
— 1/4-inch and 3/16-inch, flat-blade screwdrivers
— the ACS-7000RMK(=) rack-mount kit (with hardware) for the chassis (this kit also works
•
Whenever you remove or install processor modules, have the following equipment on hand to
help prevent ESD damage:
— Antistatic mat or antistatic foam pad in case you need to put one of the processor modules
— Your own ESD-preventive strap or the disposable ESD strap that is included with all spares
Replacing the Chassis
The Route Switch Processor (RSP2) is a required system component and should only be removed
when the system is not operation, although power can be on to the chassis. All interface processors
support online insertion and removal (OIR); however, after installing an interface processor on line,
you must wait at least 15 seconds for the system to reinitialize the interfaces before installing the
next interface processor. Therefore, it is more efficient to leave the power off until all components
are moved into the new chassis, then start up the system and check the entire installation.
If you are installing the new chassis in an equipment rack, proceed to the next section. Otherwise,
proceed to the section "Installing the Cable-Management Bracket" on page 12.
for the Cisco 7000 chassis)
down
Replacing the Chassis
Cisco 7513 Chassis Replacement Instructions
7