- ページ 3
ゲートウェイ Cisco ASR 5000のPDF インストレーション・マニュアルをオンラインで閲覧またはダウンロードできます。Cisco ASR 5000 33 ページ。 Applying power and verifying the installation
Cisco ASR 5000 にも: インストレーション・マニュアル (18 ページ), インストール手順 (8 ページ), インストレーション・マニュアル (37 ページ)
Troubleshooting
Table 1: PFU POWER LED States
Color
Description
Green
PFU powered with no errors
detected
None
PFU is not receiving power
Checking the LEDs on the SMC
Each SMC is equipped with the following LEDs as shown in the accompanying figure:
• Run/Fail
• Active
• Standby
• Status
• Service
Troubleshooting
None needed.
Verify that the power switch is in the ON position.
Verify that the RTN and -VDC lugs are attached properly.
Verify that the ground lug is attached properly. Verify that the power
source is on and is supplying the correct voltage and sufficient current.
Check the cables from the power source to the rack for continuity.
If a power distribution panel (PDP) is installed between the power
distribution frame (PDF) and the chassis, verify that the circuit breakers
are set to ON.
If a PDP is installed between the PDF and the chassis, check the cables
from the PDP to the chassis for continuity.
If all of the above suggestions have been verified, then it is likely that
the PFU is not functional. Please contact your service representative.
ASR 5000 System Administration Guide, StarOS Release 21.2
Checking the LEDs on the SMC
3