- ページ 5

配管製品 fine fixtures TDF2のPDF インストレーション・マニュアルをオンラインで閲覧またはダウンロードできます。fine fixtures TDF2 8 ページ。 Fixed full frame shower panel

2
ATTACHING THE RAIL
HORIZONTALLY
Use a measuring tape to mark
two points on the floor that are
of equal distance from the wall.
(Make sure floor is level)
2.1
Use a size 6 drill bit to drill holes
at the marked points on the floor.
2.2
Insert the wall anchors (A) into
the floor, using a hammer.
2.3
Place the rail (F) on the floor,
lining up the holes. Attach the rail
to the floor, using screws (D) and
the Allen key.
2.1
2.2
A
5
F
2.3
D
F