- ページ 7
エンジン Digiway P750のPDF 取扱説明書をオンラインで閲覧またはダウンロードできます。Digiway P750 16 ページ。 Sliding gate motor
Digiway P750 にも: 取扱説明書 (15 ページ)
Auto CLS (DIP6)
DIP6 ON selects Auto close mode. In this mode, the gate will auto close after standard auto closed
time. If DIP6 OFF, no this function.
5. Motor Set up
Push Buttons functions
Button
Dip1 on---STD Setting
OPN
Open Length Set
PED
Auto close time set
CLS
Manual close gate
OSC
Lock pulse time set
5.1 MOD1: -- E-code setting: DIP2 off and DIP4 off
MOD1 --
E-code means the encoder is set up at top of the motor and output signal is A and B with
90-degree phase delay each other. Four cores cable with plug directly plug into control board. Two
plugs on control board T4 for right hand side and T5 for left hand side.
MOD0 do not need any limit switch, but with options -- Open limit switch input as manual release
protection input and close limit switch is closed limit switch input
In this mode, gate how to stop: In closing cycle, control will check closed point (encode
count) or closed limit switch if fit, whichever happen first, then stop gate. In opening cycle,
controller will check opened point (encode count) only
Set travel limits – (Gate travel distance setup – "learn" how long the gate)
Method A
a) Connect 240V AC (if not done) and make sure power is off.
b) Releases clutch and push gate to middle position, and then engage the clutch.
c) Make sure no signals connect to OPN, PED, OSC and PEB (use Bypass jumper) terminals. Set
DIP6 on.
d) Turn power on, gate should start close at low speed. If gate opens, turn power off, change motor
direction by swapping any two of three phases output of inverter.
e) Power on again. Gate should start to close. If gate only runs short displace (about 2 seconds time)
then turn power off, change encode plug to another connector.
f) Power on again, gate start close, RED LED is flash and GREEN LED is off. When gate hit the
closed stopper, gate will stop.
g) Set DIP1 on. Push and hold OPN button, gate will start open at low speed. When gate reach
opened position, about 50-100mm before opened stopper, just simply release the OPN button.
Controller will save the current position as fully opened position. While hold OPN button, push
and release PED button will save current gate position as PED opened position.
h) Set DIP1 off and push CLS button, gate will start to close. When gate fully closed, gate will be
ready to operate. Then try to open and close. If not satisfied with the position, just repeat step (g)
to (h). For more details, see Step by step gate set instruction.
Method B --- heavy duty functional mechanical gate opened stopper and closed stopper must be
installed
a)
Connect 240V AC (if not done) and make sure power is off.
b) Releases clutch and push gate to middle position, and then engage the clutch.
c)
Make sure OPN, PED, OSC led OFF and PEB led ON. Set DIP6 on.
P750V5.0 industrial gate motor manual
Motor Set Up
ON=AUTO CLS
Special Setting
Reserved
Reserved
PE close time set
Reserved
7
OFF=NO AUTO CLS
Dip1 off---Running
Full open
Pedestrian open
Close
OSC
.