- ページ 9
ボイラー Ariston INTESA TP23のPDF ユーザーマニュアル、設置およびサービス手順書をオンラインで閲覧またはダウンロードできます。Ariston INTESA TP23 50 ページ。
Installation
6.3
Overall Dimensions
F
. 6.1
IG
Legend:
A = Central Heating Flow (3/4")
B = Domestic Hot Water Outlet (1/2")
C = Gas Inlet (3/4")
D = Domestic Cold Water Inlet (1/2")
E = Central Heating Return (3/4")
6.4
Clearances
F
. 6.2
IG
In order to allow access to the interior of the boiler for maintenance
purposes, the boiler must be installed in compliance with the mini-
mum clearances indicated in F
Supplied By www.heating spares.co Tel. 0161 620 6677
. 6.2
IG
6.5
M
OUNTING THE
After removing the boiler from its packaging, remove the template
from the separate box containing the connection kit.
Note: Pay particular attention to any test water that may spill from
the appliance.
QT002A
F
. 6.3
IG
Place the template in the position the appliance is to be mounted
and after ensuring it is hanging squarely, use it to drill the holes
for the hanging bracket and flue pipe(s) NB: For further informa-
tion relating to the flue installation please refer to Section 6.9 Flue
Connection. (If the appliance is to be fitted on a wall of com-
bustible material, the wall must be protected by a sheet of fire-
proof material).
DM001B
If the appliance is to be fitted into a timber framed building, guid-
ance should be sought from the IGE document R
9
A
PPLIANCE
: IGE/UP/7.
EF