- ページ 19

ボイラー Ariston microSYSTEM 28 RFFIのPDF 取付説明書をオンラインで閲覧またはダウンロードできます。Ariston microSYSTEM 28 RFFI 48 ページ。 Microsystem
Ariston microSYSTEM 28 RFFI にも: ユーザーマニュアル (16 ページ), 取付説明書 (24 ページ)

Ariston microSYSTEM 28 RFFI 取付説明書
4
To dismantle the front casing panel it is necessary to:
1 - Remove the two screws "B";
2 - Move the front casing panel up and lift forward.
4.4 I
S
-
NITIAL
TART
UP
4.5
C
A
OMBUSTION
F
. 4.2
IG
B
T
HE CHECKS TO BE RUN BEFORE INITIAL START
1. Make sure that:
- the screw on the automatic air valve has been loosened when the
- If the water pressure in the system is below 1.5 bar, bring it up to the
- Ensure that the gas cock is closed;
- Make sure that the electrical connection has been made properly and
- Supply power to the boiler by pushing the On/Off button "A" (see
- Loosen the cap on the head of the pump to eliminate any air pockets;
- Repeat the procedure for bleeding the radiators of air;
- Check the system pressure and, if it has dropped, open the filling loop
2. Make sure that all gate valves are open;
3. Turn on the gas cock and check the seals on the connections with an
4. Press the reset button "E" for the lighting system; the spark will light the
5. Check the minimum and maximum pressure values for the gas going to
NALYSIS
5
system is full;
appropriate level;
that the earth wire is connected to an efficient earthing system;
F
.4.1) - the L.E.D. "B" will illuminate. Then push the button "C" in for
IG
central heating - the L.E.D. "D" will illuminate. This will start the
circulation pump. After 7 seconds, the boiler will signal a shutdown due
to ignition failure. Leave the boiler as it is until all of the air has been bled
from the system.
again to bring the pressure back up to 1.5 bar.
approved soap solution and eliminate any leaks.
main burner. If the burner does not light the first time, repeat the
procedure.
the burner; adjust it if needed using the values indicated in the table in
section 5 (See the relative section for burner pressure adjustment within
the servicing manual).
The flue connector has two apertures,
taken for the temperature of the combustion by-products
and of the combustion air, as well as of the concentrations
of O
and CO
2
To access these intakes it is necessary to unscrew the front
screw and remove the metal plate with sealing gasket.
To achieve the best test conditions, turn the central heating
adjustment knob "G" to the "max" position and remove the
electrical connection to the heating sensor (see section 6.).
This will allow the appliance to operate at the maximum
heating power.
19
-
UP ARE AS FOLLOWS
, etc.
.
2
:
readings can be