- ページ 6

換気フード Whirlpool AKR 891 IXのPDF 重要安全取扱説明書をオンラインで閲覧またはダウンロードできます。Whirlpool AKR 891 IX 10 ページ。

Whirlpool AKR 891 IX 重要安全取扱説明書
INSTALLATION - ASSEMBLY INSTRUCTIONS
Before starting the installation procedure remove the perimeter suction panels from the hood,
the grease filter and the carbon filter holding frame (if installed)
Do this following the procedure below:
a. Firmly pull the panel (FRONT SIDE) downwards.
b. With some pliers, unscrew the safety knob S.
c. Detach it from the back hinges.
Remove the grease filter and the carbon filter holding frame following the instructions that can
be found in the corresponding maintenance sections.
The instructions below, in number sequence, refer to the drawing shown in the following page, also numbered accordingly.
1. Draw a mid line on the wall, up to the ceiling.
2. Cut the template by line H6 and position the drilling diagram on the wall (fix using adhesive tape). The vertical mid line printed on the drilling template
must correspond to the mid line drawn on the wall. The bottom edge of the drilling diagram must correspond to the bottom edge of the hood.
3. Place the support bracket on the drilling template so that it coincides with the dashed triangle. Mark and then drill the two external holes. Remove the
drilling template and insert 2 plugs in the wall. Fix the hood support bracket to the plugs using 2 screws.
4. Fit the hood on the bracket.
5. Adjust the distance between the hood and the wall.
6. Adjust the hood so that it is perfectly horizontal.
7. From the inside of the hood, mark the two hood fixing holes.
8. Remove the hood from the bracket.
9. Drill the holes (Ø 8 mm).
10. Insert 2 plugs in the wall.
11. Fit the G chimney support bracket to the wall at ceiling level. The small cut at the centre must correspond with the mid line drawn on the wall (operation
1). Drill 2 holes (Ø 8 mm) and insert the 2 wall plugs.
12. Secure with 2 screws.
13. Attach the hood to the bottom bracket.
14. Secure the hood to the wall in its final position, with the 2 screws.
15. Connect the cooking steam discharge tube to the fitting B. The tube must be directed towards the outside (suction model) or towards the deflector (filter
model). The deflector F must be fitted to the G chimney support bracket using 2 screws.
16. Connect the power supply.
17. Fit the chimneys in position above the hood and fully cover the suction assembly.
18. Extract the top section and secure (18a) to the chimney support G (18b) with 2 screws. Refit the carbon filter holding frame and the grease filter/s.
19. Installing the perimeter suction panel:
a. Fix the panel to the hood pins.
b. Lock the panel in position by fitting the catches S to the pins with pliers (ensure that they secured well).
c. Rotate the panels to close the suction area, and secure to the pins by pressing firmly.
IMPORTANT: always ensure that the panel is always secured in place.
Check the operation of the hood following the instructions in the hood utilisation section.
GB6