- ページ 3

セキュリティシステム Alderon Industries Oil Alert VA02のPDF 操作、メンテナンス、設置マニュアルをオンラインで閲覧またはダウンロードできます。Alderon Industries Oil Alert VA02 4 ページ。 Alarm panel

Alderon Industries Oil Alert VA02 操作、メンテナンス、設置マニュアル
Oil Alert Remote Alarm
TM
Alarm Panel Model VA02 Operation, Maintenance
and Installation Manual
Installation of the ALARM UNIT Continued
3. Continued. If connecting to existing alarm security system or (BAS) system leave terminals + & - open and use 18
gauage 2 conductor wire to connect the existing product to terminals 2A, 2B, 1A, 1B (Fig. 9). When connected, replace the
access cover and pull the wire through the knockouts on the access cover (See Step #4) .
wires, route all wires away from sharp objects & internal components.
Terminals 2A & 2B
High Water
Terminals 1A & 1B
High Oil
Class 2, 24 VDC/VAC (50/60 HZ)
500 Milliamps MAXIMUM
NOTE: The Auxiliary Contacts on the Oil Alert Remote Alarm are Normally Open only.
4. Use a needlenose pliers to remove the desired "break away tabs" from the access cover (Fig. 10). Lightly pull and twist
off tab (s). Replace access cover and run wires through the "break aways" (Fig. 11).
Remove Cover To Insert 9v
Battery. Replace Yearly.
Auxiliary Contacts Inside.
Alarm Systems
Control Panels
PO Box 827
Hawley, MN 56549
(Fig. 10)
Remove Cover To Insert 9v
Battery. Replace Yearly.
Auxiliary Contacts Inside.
Float Switches
Leak Detection Systems
(218) 483-3034
Caution!
(Fig. 9)
+
- 2A 2B 1A 1B
1 2 3 4
(Fig. 11)
Remove Cover To Insert 9v
Battery. Replace Yearly.
Auxiliary Contacts Inside.
Fax (218) 483-3036
www.alderonind.com
- When installing
+
- 2A 2B 1A 1B
P/N
Page 3 of 4