- ページ 13

配管製品 Aleko B6C SeriesのPDF ユーザーマニュアルをオンラインで閲覧またはダウンロードできます。Aleko B6C Series 16 ページ。 Outdoor barrel sauna with/without canopy

.
11
Tools for assembly bitumen roof
Prepare the following tools before assembly
1 . Tools you need to prepare
Power Drill
×
1
Screw positions and quantity of bitumen roofs
Standard component 1000X330
6 screws required
According to the tot al length of sauna
Ⅱ. Instructions for assembly bitumen roof
(1)
Take off the rear thin film of bitumen roof before Assembly.
(2)
Assembly from the center line upwards, and the teeth of the first-layer tiles should be face
up. As shown in Figure 1, fasten it to the upper semicircle of the sauna by screws with washer.
Tiles should be tightly linked to each other.
Distance
Specifications
6
870mm
f ee t
7
1070mm
f ee t
Tape
Pencil ×1
Standard component 1/2
4 screws required
- 13-
Glass Glue Gun× 1
×
1
Standard component 1/3
Standard component 1/4
3 screws required
3 screws required
Figure 1