- ページ 7
自動車アクセサリー CTEK SMARTPASS 120のPDF マニュアルをオンラインで閲覧またはダウンロードできます。CTEK SMARTPASS 120 13 ページ。
CTEK SMARTPASS 120 にも: ユーザーマニュアル (12 ページ)

3. Small service battery and solar panel
PREREQUISITES
A dual battery system where the D250SA char-
ges a 40–300Ah service battery from a solar
panel, an alternator, or both which also charge
a starter battery.
*
STARTER
BATTERY
It is advantageous to use this installation when:
• The alternator is not able to deliver the desired
charge voltage.
• Charging from a solar panel.
See also tips 1, 2 and 3.
*
SERVICE
BATTERY
*See "CABLE AND FUSE RECOMMENDATIONS"
4. Service battery with parallel consumers
PREREQUISITES
A dual battery system where the
SMARTPASS 120 charges a 28–800Ah service
battery from a alternator which also charges a
starter battery.
It is advantageous to use this installation when:
• The alternator is able to deliver the desired
charging voltage.
• The service battery capacity is greater than
100 Ah.
*
STARTER
BATTERY
• The consumers are supplied directly from the
alternator at the same time as the service bat-
tery is being charged.
See also tips 2 and 3.
+IN
+OUT
SMARTPASS 120
+OUT
*
SERVICE
BATTERY
*See "CABLE AND FUSE RECOMMENDATIONS"
EN • 9