- ページ 8

ヒーター Clarke XR 155のPDF 取扱説明書をオンラインで閲覧またはダウンロードできます。Clarke XR 155 20 ページ。 Paraffin/diesel heaters
Clarke XR 155 にも: 取扱説明書 (8 ページ)

Clarke XR 155 取扱説明書

STARTING PROCEDURE

Before starting the heater, you MUST ensure that the minimum ventilation
requirements are observed, to avoid the risk of carbon monoxide poisoning.
Ensure the fuel tank is filled with the correct fuel, before plugging in to a suitably
earthed supply. If you are changing the type of fuel, ensure the blanking plate at
the rear of the burner is set to the correct position (see Notes on page 7).
It will be necessary to remove the top cover, by removing its 6 securing screws, to
gain access to the rear of the burner, and the blanking plate.
If necessary, slacken off the blanking plate securing screw, turn the plate to its
required position and tighten the securing screw. Replace the top cover,
then,observing all precautions previously stated, push The start switch
located on the left side of the machine, and shown at 8, fig. 1.
It is important to ensure that adequate ventilation is provided. The following chart
gives the MINIMUM requirements
Heater Model
eg. For XR75, a 3ft window must be open by 10" minimum
PARTS & SERVICE
CLARKE International, on one of the following numbers.
PARTS & SERVICE TEL: 020 8988 7400
PARTS & SERVICE FAX: 020 8558 3622
Minimum fresh air opening requirements
Ventilation ft
XR55
XR75
XR105
XR155
Please contact your nearest dealer, or
or e-mail as follows:
Warning!
Minimum
2
1.6
2.5
3.0
4.6
8
Minimum
2
Ventilation mtrs
0.15
0.23
0.28
0.43
- '1'