- ページ 9

屋外倉庫 Armorgard forma-stor FR400-TのPDF ユーザーマニュアルをオンラインで閲覧またはダウンロードできます。Armorgard forma-stor FR400-T 12 ページ。
Armorgard forma-stor FR400-T にも: ユーザーマニュアル (9 ページ)

Using the lifting eyes

1.
Before lifting, ensure that the bolts
holding the lifting eyes are securely
in place.
WARNING! The lifting eyes are provided only for positioning
the Forma-Stor, and the unit must be empty while lifting.
Before lifting, each lifting eye needs to be checked that it is
fitted correctly, and should be inspected by a lifting operator
before use.
2.
Attach the lifting equipment to all
four lifting eyes and ensure that
the load is lifted evenly across all
four eyes.
9