- ページ 2

ウォーターヒーター Aerco INNOVATION INN1060のPDF 電気マニュアルをオンラインで閲覧またはダウンロードできます。Aerco INNOVATION INN1060 5 ページ。 Natural gas modulating condensing hot water boiler

Aerco INNOVATION INN1060 電気マニュアル
1 GENERAL
Innovation (INN) Gas Fired Hot Water Boilers are fully factory wired and packaged units which require
simple power wiring as part of the installation. This technical guide is intended to help designers
provide electrical power wiring (line voltage) to Innovation units. Control wiring details are provided in
other publications depending on the intended application. This document is intended as a guide only,
and cannot include all alternatives, situations, or be totally inclusive. To comply with all codes and
authorities having jurisdiction, designers and installers must plan the electrical wiring carefully and
execute the installation completely. Emergency shutoffs, fusible fire switches, break glass stations,
and other electrical requirements should be considered and installed whenever necessary.
2 Hot Water Boiler Electrical Requirements
Innovation Hot Water Boilers require the following electrical supply:
Refer to Figure 1 for typical electrical shutoff disconnect switch location.
The distribution block for field connection is located in the upper right of the control box (see Figure 2).
All copper wire must be connected to the terminal distribution block. Voltages lower than the rated
input will result in increased wear and premature failure of the blower motor. Wire size and type
should be made per the National Electrical Code based on length and load.
02/23/2017
AERCO International, Inc. • 100 Oritani Dr. • Blauvelt, New York 10913 • Phone: 800-526-0288
Innovation Series Hot Water Boiler
Electrical Power Guide – INTERNATIONAL EDITION
220 volts, single phase, 50 Hz, 15 Amps
Figure 1. Service Switch Typical Location
GF-5065
TAG-0082_0B
ELECTRICAL SHUTOFF
DISCONNECT SWITCH
Page 2 of 5