- ページ 7

湿らせる Armstrong AM-1400MのPDF 設置および操作マニュアルをオンラインで閲覧またはダウンロードできます。Armstrong AM-1400M 18 ページ。 Humidifiers for air handling systems

Figure 5-1. Installation Detail for Horizontal Manifold Installation in Vertical Air Flow Ducts
Dimensions and pipe sizes are given in Tables 8-1 and 8-2 on Page 8.
Strainer
Trap
Figure 5-2. Installation Method Where
Vertical Manifold Installation is Required
Dimensions and pipe sizes are given in Tables
8-1 and 8-2 on Page 8.
Supply Pipe
N Min.
Drip Leg
Dirt Pocket
OR
Manifold
Strainer
Drip Leg
Dirt Pocket
Trap
Manifold
Manifold
Pipe Adaptor
OR
U Min.
5