- ページ 6

浄水器 Blagdon PRO UVC 16200のPDF マスター・マニュアルをオンラインで閲覧またはダウンロードできます。Blagdon PRO UVC 16200 8 ページ。 Green water clarifier

Blagdon PRO UVC 16200 マスター・マニュアル
UVC_Pro_Inst_AW.qxd
5/2/08
11:33
INSTALLATION

CONNECTING TO YOUR PUMP

The pump supplying the PRO UVC must not have a pumping head exceeding 20m - 2 Bar.
The maximum flow rate recommended is stated in the UVC performance and specification chart.
This flow should not be exceeded.
The ideal flow rate for your pond is to pump the volume of the pond water through the UVC every 2-4
hours. To calculate your pond volume: average length (m) x average width (m) x average depth (m) x
1000 = Litres Pond Volume.
To calculate your pump's flow rate, fill a container from the outlet hose of the UVC at the pond side.
Time how long this takes in seconds e.g. a 10 ltr bucket takes 12 seconds to fill. Divide 3600 (the number of
seconds in an hour) by the time it takes to fill the bucket e.g. 12 seconds. Then multiply by the volume of
the container. e.g. 10 ltr. Therefore - 3600 ÷ 12 = 300 seconds 300 x 10 ltr = 3000 ltrs per hour flow rate.
To increase flow you may need to get a larger pump. If flow is too high use an inline valve to reduce it.
The purpose of the pump is to transfer green water from the pond to the PRO UVC.
Placing the pump at the opposite end of the pond to the UVC will give the best results.
UVC LAMPS & QUARTZ SLEEVE MAINTENANCE
The UVC lamp must be replaced every six months / once a season. It is recommended that the lamp
is replaced and reconnected in the spring.
The Quartz sleeve can become coated in lime scale build up in hard water areas. This should be
carefully removed from the quartz sleeve and cleaned with a soft cloth.
A wet test must be carried out after maintenance to ensure there are no leaks before the UVC is
reconnected.

WET TESTING THE UVC

IMPORTANT:
A wet test of the UVC under operating conditions must be carried out before
the UVC or electrical supply is installed.
Connect the UVC to the pump following all installation instructions.
After running for 24 hours check for leaks.
8
Page 6
INSTALLATION

TESTING/REPLACING THE UVC LAMP

IMPORTANT:
Ensure that the mains supply is switched off and the power isolated before
removing the UVC cover.
1.
Unscrew the UVC electronics cover cap.
2.
Inspect the UVC cap and Quartz sleeve for water leaks.
3.
If there are no signs of leakage reverse the procedure ensuring that the Cover O-ring is in place.
4.
This unit is protected by a micro switch that prevents the UVC light from illuminating when the
cover is removed even if the power is on.
5.
In order to check that the UVC lamp is operating check the lamp indicator window. This operation may
need to be carried out at dusk as UVC lamps emit a dim blue light under normal operation.
4
3
5
2
1
If there has been any damage to the unit please return to the point of purchase for inspection.
This test should be repeated whenever the the bulb or quartz is changed.
WARNING: Direct exposure to UVC light can damage your eyes or skin.
9