- ページ 7

3Dプリンター 3D Systems ProJet MJP 5600のPDF オリジナル取扱説明書をオンラインで閲覧またはダウンロードできます。3D Systems ProJet MJP 5600 18 ページ。

When moving, DO NOT push from the front of the printer. It can tip over if casters are on uneven
flooring. Always push printer from the side.

Power Requirements

Voltage
100 VAC
115 VAC
240 VAC
NOTE: All 240VAC markets require a step down transformer with 100-120VAC output for proper
heater control.
Please have 3D Systems direct or partner order the correct nationalization kit.
The installation of the printer shall comply with the National Standards and/or Electrical Codes of the
country in which it is placed.
Printer Power Considerations
During normal operation, the power usage of the printer will not exceed the continuous current rating
indicated in the electrical section (above). A dedicated, surge-and-spike protected electrical power
circuit for each printer should be provided that meets or exceeds the corresponding continuous current
rating.
Protected Power/Uninterrupted Power
A dedicated, surge and spike protected electrical power circuit is recommended for each printer installed. No other equipment is to be installed on
this circuit.
Uninterrupted power/active battery backup is recommended, especially in areas where circuits may be affected by an outside source, e.g., lightning
strikes, power interruption, etc.
A 5kVA UPS supplying 120V to the product is required. The machine shall be powered by 100-120V nominal when a UPS is utilized. Some examples of
suppliers are Toshiba, APC, Eaton and Liebert. For International 230V markets, a stepdown transformer is always required. Power loss during a build
will cause the build to fail and can cause damage to your printer.
For installations with a UPS, consult the installation guide for the UPS to determine wiring and circuit requirements in advance of printer installation.
ProJet® XL Finisher (Optional) Power Requirements
The ProJet® XL Finisher must be hardwired and installed by a Certified Electrician. For more
information about the ProJet® XL Finisher click here.

Client Workstation Requirements

Before a part can be built on the printer, the build data file must be saved or exported to the industry-
standard .stl file format, and submitted over the network. The client software which is installed on the
users' workstation allows the user to select, preview, and submit jobs, as well as manage the build
queue (for designated administrators).
Prior to installing the software, ensure that each workstation meets the following minimum
specifications. The specifications described represent 3D Systems tested minimum "baseline"
configuration for using the client software.
Minimum
OS
Windows 7, 8 or 10 (64 bit)
Frequency
50/60 Hz
50/60 Hz
50/60 Hz
Phase
Single
Single
Single
Recommended
Amps
15
20
8