- ページ 6

ガレージドアオープナー CAME BK-2200TのPDF インストレーション・マニュアルをオンラインで閲覧またはダウンロードできます。CAME BK-2200T 17 ページ。

CAME BK-2200T インストレーション・マニュアル

Installation

Installation must be carried out by expert qualified personnel and in full observance of regulations in force.

Preliminary checks

Before proceeding with the installation, it is necessary to:
• Make sure the door is rigid and compact and that the sliding wheels are well oiled and in good condition.
• The ground guide must be well fastened to the ground, fully on the surface for the entirety of its length and without irregularities that
might obstruct the gate's movement.
• The upper guide runners must not create friction.
• Provide for a gate stopper for opening and one for closing, and for the path of electrical cables as per standard system.
• Make sure the point in which the ratiomotor is fixed is in an area protected from shocks or bumps, and that the anchoring surface is solid.
• Provide for suitable omnipolar disconnection device with more than 3 mm between contacts to section power supply.
Connections inside the case made for protection circuit continuity are allowed as long as they include additional insulation with
respect to other internal drive parts.
• Install suitable tubes and ducts for electric cable passage to guarantee protection against mechanical damage.
Tools and materials
Make sure all tools and materials necessary are within reach to install the edge in maximum safety, according to regulations in force.
The following figure illustrates the minimum equipment for the installer.
Cable list and minimun thickness
Connections
230/400V power supply
Motor power supply 230V/400V
24V - 230V flashing lamp
Photoelectric cells TX
Photoelectric cells RX
24V power supply accessory
Control button
Antenna connection
N.B.: An evaluation of the size of the cables with lengths other than the data in the table must be made based on the eff ective
absorption of the connected devices, according to the instructions indicated by the CEI EN 60204-1 standards.
For connections that require several loads on the same line (sequential), the size given on the table must be re-evaluated based on
actual absorption and distances.
Length of cable
Type of cable
1 < 10 m
4G x 1,5 mm
4G x 1,5 mm
FROR CEI
2 x 1,5 mm
20-22
2 x 0,5 mm
CEI EN
4 x 0,5 mm
50267-2-1
2 x 0,5 mm
2 x 0,5 mm
RG58
Length of cable
10 < 20 m
2
2
4G x 2,5 mm
2
2
4G x 1,5 mm
2
2
2 x 1 mm
2
2
2 x 0.5 mm
2
2
4 x 0,5 mm
2
2
2 x 0,5 mm
2
2
2 x 0,5 mm
max. 10 m
Length of cable
20 < 30 m
2
4G x 4 mm
2
4G x 2,5 mm
2
2 x 1,5 mm
2
2 x 0,5 mm
2
4 x 0,5 mm
2
2 x 1 mm
2
2 x 0,5 mm