Control board and alarm system
there must be an electricalcontrol board equiped with
feed water syst em of boiler ,safety system and protection
Party on alarm system of boiler,
1) Maximum pressure system and alarm
2)Minumum water level and alarm
3)Boiler must include furnace over heat safety adn alarm
NOT E: 1.Preparing of installion depends on using steam of boiler.And adgustment
assembling of instruments of boiler must be done by qualifed service company.
2. Do not charge the adjusmtments of equipments and do not allow people
unauthorized operase the boiler.
BOILER OPERATION
Boiler operators are responsible of interfering in any urgnt situation.
The most important point, operators must know the principles of all equipments,property
of working, pressure, temperature and flowrates must be known by the operator.
They must know all control circuit,measurement equipments function and
working at electrical protect circuit very well.
BOILER OPERATOR MUST HAVE A VALID LICENCE OR CERTIFICATE
Operating boiler without licensed or certificated operator makes the guarantee invalid.
There must be an boiler operating note book and it must be filled daily.
There is a sample daily control table (Table 4).
This table must be filled daily if the controls are not done periodically and this notebook
is not filled regularly guarantee is not valid.
GETTING STARTED WITH BOILER AND FIRST START UP
* All equipments of chimney draft system and burning equipments must be working
correctly ,all dompersmust be fixed both opening and closing easily.
* If there are automatical burning system or any other automatical controls,all
of adjustments tests,caliberations of this systems must be controlled.
Tests,adjusments and functions controls of electrical protection and locking system
must be done and all equipments of system must be existed in working condition
* All blowdowns,discharging valves,level indicator discharcing volves,feed
water manuel vaves and control valves must be checked and must let no leakage.