- ページ 11
室内装飾品 ClearSpan ClearSpan 3060SSのPDF マニュアルをオンラインで閲覧またはダウンロードできます。ClearSpan ClearSpan 3060SS 18 ページ。 Shade system
INSTALL THE MAIN FRAME COVER
After the frame is properly assembled and anchored, install
the main cover.
Gather the parts:
•
Snugger ball tie downs (#CC4595)
•
Main cover
NOTE: Assistance is required to install the cover.
WARNING: To prevent property damage
and personal injury, do not install the
cover on a windy or stormy day.
NOTE: Dashed lines show where to
attach the main cover to the frame.
The main cover will not wrap
around the frame piping.
1. Locate the main cover, unfold it along the assembled
frame, and drape it over the frame and into position.
2. Take the snugger ball tie downs, feed the stretch cord
through a grommet, and attach the main cover to
the assembled frame. Use one snugger ball for each
grommet.
3. Continue with the shelter care and maintenance
information that follows.
Revision date: 10.09.07
1
Visit www.ClearSpan.com for additional products and customer assistance.
CLEARSPAN
SUNBLOCKER SYSTEM
™
A space will remain
between the edge of the
main cover and the frame.
See the inserts below and
to the left.
2
3
11