- ページ 10

フィットネス機器 fitness gear Ultimate Smith IIのPDF 組み立て説明書、イラスト、パーツリストをオンラインで閲覧またはダウンロードできます。fitness gear Ultimate Smith II 13 ページ。

fitness gear Ultimate Smith II 組み立て説明書、イラスト、パーツリスト
T9533
# 8 Pec Deck Cables Installation
1
Unwrap the pre~tnstalled left pec deck cable (M) from the pulley (P2) located on the pee deck support
post ('2) and men the cable front loose end (44E) through the left pulley sacket (Pl) located on the
pee deck backing plate (55) and then attach the cable lront loose end (446) to the left pec deck
amushng plate (39) usmg a shoulder bolt (70) as shown Ttghten the bolt securely
lnsen the rear end of the left pec deck cable (44) through the pre-tnstalled double pulley assembly
(8983 and place the cable onto the lower pulley ol the double pulley assembly (898) and attach the
rear end 01 the left pec deck cable (44) to the cable ltnlu'ng plate (72) located on the pec deck tree
pulley assembly (75) usmg a belt (74). two washers (18) and a nut (20). Ttghten the bolt securely
NOTE: Be sure that the loft pee deck cable (44) ls ln the groove of each Pulley and that the
Cable and Pulleys move smoothly.
4
Repeat steps 1-2on the right side at the Fitness Gear Ultimate Smith 2.
419..
v. .
.
.Mt',..~;tsflr.uwwmlm
' .:,1fr-¢>:'"h§t
60
90
44
44
60
".17...
46