- ページ 8

レシーバー Altronix eBridge PLUS eBridge16PCRMのPDF インストレーション・マニュアルをオンラインで閲覧またはダウンロードできます。Altronix eBridge PLUS eBridge16PCRM 8 ページ。 Ip and poe+ over coax solution

Altronix eBridge PLUS eBridge16PCRM インストレーション・マニュアル
Rack Mount Installation
1. Remove and discard factory installed screws from both sides of rack chassis (Fig. 4a).
2. Install mounting brackets (A) on the left and right side of rack chassis using the four (4) flat head screws (B)
(included) (Fig. 4b).
3. Place unit into desired EIA 19" rack position and secure with mounting screws (not included) (Fig. 4c).
Fig. 4
Fig. 4a
Top
Front
Left
Remove
Wall Mount Installation
1. Install mounting brackets (A) on the left and right side of rack chassis using
four (4) flat head screws (B) (included) (Fig. 5a).
2. Place unit at desired location and secure with #6 size screws or larger (not included) (Fig. 5b).
Caution: It is necessary to make sure mounting screws are securely fastened
to a beam when installing the unit vertically.
Fig. 5
Fig. 5a
B

Shelf Installation

1-
Position and affix rubber pads (C) (included) at each corner on the bottom of the unit (Fig. 6).
2-
Place unit in desired location.
Fig. 6
Altronix is not responsible for any typographical errors.
140 58th Street, Brooklyn, New York 11220 USA | phone: 718-567-8181 | fax: 718-567-9056
website: www.altronix.com | e-mail: [email protected] | Lifetime Warranty | Made in U.S.A.
IIeBridge8PCRM/16PCRM
- 8 -
Mounting Options:
B
Fig. 5b
A
Left Side
C
Rubber
Pad
Fig. 4b
Top
Front
Left
A
Dotted lines indicate studs behind sheetrock.
Mounting Hardware (Included):
Two (2) mounting brackets
A
Six (6) flat head screws
B
for mounting brackets.
Four (4) rubber pads.
C
G18R
Fig. 4c
Top
Front Left
MEMBER
eBridge8PCRM/16PCRM