QUICKSTART "BASIC" GUIDELINES FOR MODEL 6300 - FOR GATES UP TO 18 FEET AND OPENING 90°
Model 6300 is intended for installation
only on swing gates used for vehicles.
Pedestrians must be supplied with a separate
access opening.
For safety and installation instructions, please
refer to the Installation/Owner's manual.
Operator Position
34"
Closed Gate
Gate Bracket
90°
Note: 2" thick gate Illustrated.
Important:
A straight
line drawn from the
closed gate bracket
through the open
gate bracket MUST
intersect the operator
output shaft.
Important:
Elbow flange MUST be on
the opposite side of the closed gate.
Manually adjust the arms to get the
correct open and closed positions
BEFORE powering up the operator.
Open/Close limits will be automatically
set the first time operator is cycled.
Concrete Position
Closed Gate
Closed Gate
90°
90°
Mount the
Note: 2" thick
23"
post base into
43"
gate Illustrated.
the concrete
before
installing the
Post
operator.
Base
5"
2"
Post Base
MUST be Level.
22"
Post
Run conduit on
Base
the opposite
1.5"
side of the
open gate for
the post base.
Output
12"
Shaft
12"
12"
43"
3"
Safety
Cover
Operator
Output
Shaft
0
# 2
t o
1
# 1
m
C o
t o
7
1 .
l a y
o #
R e
l t t
2 .
V o
2 4
3 .
1
2
3
D
16.5"
43"
Pad
Base
Concrete Pad
3"
Conduit
Pad MUST
10"
be Level.
14"
30"
3/8
Secure operator
to the concrete
pad with six (6)
12"
3/8" x 3" sleeve
Output Shaft
3"
anchors
Position
23"
(not supplied).
20
B
11
7
C
l e
x i b
A
i t
F l e
n d u
C o
Manual Release
w
L o
l t
V o
h
H i g
l t
s
V o
o x e
n B
Gate Bracket
c t i o
t h e
J u n
o f
s
p t h
t e i
Height
D e
c r e
y
c o n
d b
i n e
s
t i o n
e r m
d e t
n d i
a l
l c o
l o c
s o i
a n d
s .
o d e
g c
l d i n
b u i
5"
Gate
"
3 / 4
e p s
w e
Bracket
A C
h S
r
w e
w i t
60" Connecting Arm
i t
P o
n d u
u i t
Brass Bushing
o n d
C o
Varies with base used.
p C
L o o
Ground
Copyright 2012 DoorKing, Inc. All rights reserved.
D
DIP-Switch Settings
Using shadow loop and gate opening
in direction shown.
Auto Close
1. OFF
Timer
2. OFF
3. OFF
4.
ON
5.
ON (Operator Type)
6. OFF
Adjust
7.
ON (Single Operator)
1 to 23 sec.
8.
ON (Tamper Protect)
SW 1
B
1.
OFF (Opening Counter-Clockwise)
2. OFF
(See reverse side)
3. OFF
4. OFF
5.
OFF (Normal Reverse Function)
6. OFF
7. OFF
8. OFF
SW 2
•
NO AC power.
•
NO DC power (On select models).
1
2
Arms and Operator
MUST be level.
Bottom Plate of 6300
30" Crank Arm
Flange
Crank Power Arm
Elbow Assembly
Important:
Adjust the locknut on the crank power arm
so that it is snug against the washer, but will still allow
the 30" crank arm to rotate with little force.
120 Glasgow Avenue
Inglewood, California 90301
U.S.A.
High Voltage Connection
GATE OPERATOR MUST BE PROPERLY GROUNDED!!
Tip:
It is recommended that a surge suppressor
be installed on the high voltage power lines.
115 VAC
DANGER
HIGH VOLTAGE!
Chassis
Ground
A
Important:
The elbow
assembly must be in
the correct position
on the arms BEFORE
cycling operator the
High Voltage
first time.
Conduit
Note: "Optional" High Voltage Kit
black and white wires connect the
same as shown. See High Voltage
Kit instruction sheet for more
information.
Loop Detectors
C
Not included - Refer to the Installation/Owner's
manual and Loop Information Manual (available
FREE from www.dkaccess.com) for more
information on loops and loop detectors.
Radio Receiver
D
Not included - Refer to a specific Radio Receiver
Manual (available from www.dkaccess.com) for
more information on radio receivers and antenna
installation. (See reverse side for wiring)
6300-066-G-12-12