- ページ 4
ソーラーパネル AkoTec Weiser ProtectのPDF インストレーション・マニュアルをオンラインで閲覧またはダウンロードできます。AkoTec Weiser Protect 20 ページ。
1
Safety in general:
Installation may only be carried out by qualif ied personnel in accordance with
the applicable regulations and standards. Improper installation can
lead to damage to the collectors and the entire system.
In addition to these important applicable standards, the national installation
regulations, legal regulations for accident prevention, environmental protection
and the professional associations must be observed, as well as the relevant safety
regulations of DIN, EN, DVGW and VDE.
DIN EN 1991-1-4
and DIN EN 1991-1-3
DIN EN 62305-3 and
DIN VDE 0185
EnEV
Transport and storage
- store tubes and collectors in a dry place until installation and store them in
their packaging to protect them f rom damage.
The surface must be level.
- do not load the tube and collector cartons f rom above, except for identical
cartons. Stack a maximum of 7 tube cartons on top of each other.
-
transport and store tubes and collectors horizontally, paying attention to the
top and bottom.
-
handle full-vacuum tubes carefully and only touch them with cotton gloves.
page 4
Notes
Please also refer to the planning and commissioning
instructions and the data sheet. Both can be downloaded f rom our
website.
https: //www.akotec.eu/english/downloads/
Fundamentals of structural design and effects on
supporting structures-snow loads and wind loads
Grounding and lightning protection
Insulation of pipelines