- ページ 17

自動車 Dodge 3500 Ram Chassis Cab vehicleのPDF オペレーション&インストレーション・マニュアルをオンラインで閲覧またはダウンロードできます。Dodge 3500 Ram Chassis Cab vehicle 17 ページ。 2011 chassis cab

2011 Chassis Cab PTO Operation & Installation Guide
5. Remove the fasteners and sealer from around the patch panel. Cut away the sound
deadener pad to expose the transmission PTO access.
6. You are now able to install and assemble the PTO and pump through the opening.
Note: larger pumps must be inserted through the hole and moved toward the rear of
the opening before installing the PTO. The pump is then slid forward to connect to
the installed PTO.
7. To assemble, reverse the above procedure using RTV to reseal the PTO floor pan
patch panel.
01/22/2010
-
-
+
+
ALL
ALL
IN
IN
OUT
OUT