- ページ 12

バッテリーチャージャー ClipperCreek HCS SERIESのPDF インストレーション・マニュアルをオンラインで閲覧またはダウンロードできます。ClipperCreek HCS SERIES 20 ページ。 Quad-mount kit. innovative infrastructure for electric and hybrid vehicles
ClipperCreek HCS SERIES にも: インストレーション・マニュアル (9 ページ)

HCS QUAD PEDESTAL KIT INSTALLATION GUIDE
ClipperCreek
INITIAL PEDESTAL INSTALLATION (continued)
, Inc.

5. Remove the Pedestal Post Cap

A pedestal cap is provided to cover the opening to protect
the conductors and inner pedestal from the elements. It
may have already been assembled on the post for
protection during shipping. Remove this cap for addition-
al access to electrical connections. The HCS Quad-Mount
will use a different cap without flanges.

6. Install the Conduit Assembly

• On the side of the pedestal post adjacent of the first EVSE, remove the 1½" plastic plug closest to the
EVSE, labeled in Figure 9 as c1or c2.
• Connect the following to the Pedestal Post in the order as shown in Figure 9:
a) The Standard 90 degree 1/2" NPT Fitting
b) The ½" liquid tight sealing washer
c1) or c2) The open pedestal hole
d) The locknut from the NPT Fitting (inside of the pedestal)
• Tighten so that the bottom opening of the NPT Fitting is facing downward.
• Repeat the previous steps for the EVSE on the right side, using the opening on the adjacent post side to the
right.
• Repeat these steps for the second EVSE.
• For Quad-Mount Installations, repeat on the opposite side.
Figure 9: HCS Pedestal Conduit Assembly
Ground Lug
Location
When installing only two
front-facing EVSEs, using
only the closest c1 or c2
opening per side depending
on how your pedestal is
oriented.
c2.
c1.
d. Not shown, install inside
b.
the pedestal.
a.
Figure 8: Cap Removal
Remove the Cap and screws/washers
Page 12