- ページ 4

ラボラトリー機器 CytoTherm CT-D4のPDF マニュアルをオンラインで閲覧またはダウンロードできます。CytoTherm CT-D4 12 ページ。 Dry plasma thawing with massaging action

CytoTherm CT-D4 マニュアル
3. Plasma bag and BLADDER both leaked
Plasma bag and BLADDER both leaked. It is a very unlikely case. After you determine that the plasma bag
leaked, discard the plasma bag(s) and squeeze down lightly on the BLADDER. If the bladder is also leaking,
leaked, discard the plasma bag(s) and squeeze down lightly on the BLADDER. If the bladder is also leaking,
leaked, discard the plasma bag(s) and squeeze down lightly on the BLADDER. If the bladder is also leaking,
the volume of the leaked solution in the front of the RACK will increase. Remove the BLADDER (see #2
of the leaked solution in the front of the RACK will increase. Remove the BLADDER (see #2
of the leaked solution in the front of the RACK will increase. Remove the BLADDER (see #2
above) and discard it. Wipe the section of the RACK with bleach towelettes or a 10% bleach solution. DO NOT
above) and discard it. Wipe the section of the RACK with bleach towelettes or a 10% bleach solution. DO NOT
above) and discard it. Wipe the section of the RACK with bleach towelettes or a 10% bleach solution. DO NOT
USE CONCENTRATED BLEACH.
USE CONCENTRATED BLEACH.
If you need to rush thawing the plasma bags in the sterile section, you can do the full clean up later. Use plugs
If you need to rush thawing the plasma bags in the sterile section, you can do the full clean up later. Use plugs
If you need to rush thawing the plasma bags in the sterile section, you can do the full clean up later. Use plugs
to close off the stainless steel ports, turn the unit on and start thawing. You will have to watch the plasma bags
to close off the stainless steel ports, turn the unit on and start thawing. You will have to watch the plasma bags
to close off the stainless steel ports, turn the unit on and start thawing. You will have to watch the plasma bags
to see when they are thawed, because the count down timer will restart from the full thawing time.
Do a full clean up. Lift the front of the RACK, disconnect the RACK TUBING and place the RACK aside.
Do a full clean up. Lift the front of the RACK, disconnect the RACK TUBING and place the RACK aside.
Do a full clean up. Lift the front of the RACK, disconnect the RACK TUBING and place the RACK aside.
Drain all the water in the bath.
Drain Tube Assembly
Part C-VLVM
After water starts to flow, gently pinch the drain tube and release to
After water starts to flow, gently pinch the drain tube and release to
remove any air to improve flow.
. It is a very unlikely case. After you determine that the plasma bag
, because the count down timer will restart from the full thawing time.
, because the count down timer will restart from the full thawing time.
CT-
-D4 Quick Connect Drain
Insert drain tube into drain housing part C-VLMF.
Insert drain tube
clock wise to lock.
clock wise to lock.
4
VLMF. Push in and turn