- ページ 8
リフティングシステム BlueSky Mast 350G XL SeriesのPDF クイック・リファレンスをオンラインで閲覧またはダウンロードできます。BlueSky Mast 350G XL Series 10 ページ。
BlueSky Mast 350G XL Series にも: クイック・リファレンス・シート (10 ページ)

19
Remove the mast pole.
24
Remove the primary guy ropes.
29
Use the crow bar to remove both
stakes from the tilt leg base plate.
34
Release the ball stop from the
holder and wind up the cable on
the winch.
Do Not Duplicate, Alter, or Copy without the Express Written Consent
of BlueSky Mast, Inc. Copyright 2019 Allendale LLC All Rights Reserved
Quick Reference Sheet - Primary Guying Only
20
Raise the lift base plate until it
nests firmly into the next mast
pole.
25
Pull in all the slack, wind and stow
the four primary guy ropes.
30
Now remove the single stake on
the right side of each of the re-
maining base plates.
35
Remove and stow the winch
handle.
350G XL - Lift Series
Lowering / Recovery
21
Adjust the four primary guy ropes
and make sure the mast is
straight and perpendicular.
26
Pull the pin to release the primary
guy ring.
31
Hold the mounting pole, loosen
the turn knob on the tilt leg and
SLOWLY kneel the tripod.
36
Remove and stow the lift base
plate.
Read Manual Before Use
Refer to detailed instructions in the
350G XL Lift Series Manual at all times
22
Repeat this process for the next
couple poles.
27
Use the hammer to tap the guy
stakes side to side and back and
forth to loosen / remove them.
32
Remove all devices and accesso-
ries from the mounting pole.
37
Release the cam lock and remove
and stow the mounting pole.
Lock the cam lock.
23
Continue lowering the mast until
you reach the primary guy ring.
28
Stow the four guying stakes in the
stake bag.
33
Remove primary guy ring and
stow it with the guy ropes.
38
Collapse the two extended tripod
legs.