- ページ 2

リフティングシステム BlueSky Mast AL2 STANDARD SeriesのPDF クイック・リファレンス・シートをオンラインで閲覧またはダウンロードできます。BlueSky Mast AL2 STANDARD Series 6 ページ。

BlueSky Mast AL2 STANDARD Series クイック・リファレンス・シート
19
Locate the lift base plate and
set it on the ground below the
mast pole in the tripod.
24
Slowly release the cam lock and
allow the first mast pole to rest
on the lift base plate.
29
Lock the cam lock and lower the
lift base plate to the ground.
Insert another mast pole.
34
Attach the blue clip of the 1st secondary guy rope to the round hole on the
secondary guy ring and walk away from the mast while unwinding all of
the guy rope. Place it on the ground between the 2 primary guy ropes.
Do Not Duplicate, Alter, or Copy without the Express Written Consent
of BlueSky Mast, Inc. Copyright 2015 BlueSky Mast, Inc. All Rights Reserved
Quick Reference Sheet - Primary and Secondary Guying
20
Pay out enough cable to go
through the pulleys and back up
to the ball stop holder.
25
Raise the mast by turning the
winch handle clockwise until 4
inches show under the tripod.
30
WARNING: If at any point the
mast begins to slip while the
cam lock is locked - STOP
AL2 Lift Series
DEPLOYMENT
21
Locate the ball stop holder on
the bottom of the tripod
opposite the winch.
26
Lock the cam lock and lower the
lift base plate to the ground.
Insert another mast pole.
31
Use the 7/16 wrench and tight-
en the cam lock a quarter turn
until slipping no longer occurs.
35
DO NOT stake the secondary
guy rope at this time.
Read Manual Before Use
Refer to detailed instructions in the
AL2 Lift Series Manual at all times
22
Pull the pin and guide the ball
stop into place. Release the pin
to secure the ball stop.
27
Raise the mast pole until the
castle cuts on both mast poles
nest together.
32
Repeat steps 25 - 28 until you
have reached 1/2 the total mast
Height.
36
Repeat this process until all secondary guy ropes have been deployed
at a 45 degree angle from the primary guy ropes. DO NOT Stake the
secondary guy ropes. They will be staked at the end of deployment.
23
Crank the lift base plate up until
it nest into the bottom of the
mast pole and the cable is taut.
28
Slowly release the cam lock and
raise the mast pole until 4
inches show below the tripod.
33
STOP at 1/2 the total mast
height and lock the cam lock on
the blue secondary guy ring.