- ページ 14
モニター ambiq micro Apollo4 Blue EVBのPDF クイック・スタート・マニュアルをオンラインで閲覧またはダウンロードできます。ambiq micro Apollo4 Blue EVB 20 ページ。 Evb display kit
ambiq micro Apollo4 Blue EVB にも: クイック・スタート・マニュアル (18 ページ)
8.
Power Supply Options and Measuring Current
The Apollo4 EVB is intended to operate off of a 5 V supply, which is used to generate downstream
voltages.
There are two power supply options for the EVB SoC:
▪ Operate at 1.9 V by default as provided by the on-board power supply (referred to as nominal
"VDD_1.8V"). This can be adjusted to 1.8 V by shorting SB4 shown on the Power Supplies page of the
(1)
EVB schematic
.
▪ Provide externally supplied power.
The EVB utilizes solder-bridges for connecting and disconnecting rails from power supplies, whether
generated on-board or off-board. Figure 7 shows the solder-bridge connection strategy between various
on-board power supplies and the SoC's power rails.
Figure 7. Apollo4 EVB Power Supplies Solder Bridge Connection
1. Refer to the EVB schematic and assembly drawing for purpose and location of all solder bridges on the
EVB.
QS-A4-4p1
Apollo4 EVB Quick Start Guide
Page 14
2023 Ambiq Micro, Inc.
All rights reserved.