INSTALLATION
2.
Install a circular duct and secure with clamps
or ties and seal with mastic or approved foil tape.
A 4", 5", or 6" circular duct is needed to connect
to relevant part of adaptor. (Fig.14)
Follow step 4 of Installation
CONSTRUCTION page 8) to complete the
adaptor installation. (Fig.14)
Remove the knock-out plate and secure conduit
3.
or wire protector nut to knock-out hole. (Fig.15)
Refer to wiring diagram on page 5.
Using UL approved wire nuts, connect house power
wires to the ventilating fan wires (Fig.15), then fix
it to fan body
IMPORTANT:
Follow all the local electrical safety codes as well
as the National Electrical Code (NEC).
4.
Push the fan body upwards until the fan body is
secure with the joint, and secure them by using the
remaining 3 self-drilling screws (ST4X30) (Fig.16)
5. Follow step 9 of Installation
CONSTRUCTION page 10) to complete the
installation.
12
II
(RETROFIT) CONTINUED
I
(NEW
I
(NEW
Screws
(ST4x30)
Attach cable clamp to Knockout
Plate. Knockout Plate mounts to
outside of Housing and may be
oriented as desired.
Nuts
II
Connect
wires
White
Black
Red
Green
Wire nuts
3 Screws
(ST4x30)
Unit:inches (mm)
Fig.14
III
IV
Screw from
Parts Bag
Fig.15
Fig.16