Cobalt Aquatics C-VUE 26 조립 지침 매뉴얼 - 페이지 3

{카테고리_이름} Cobalt Aquatics C-VUE 26에 대한 조립 지침 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. Cobalt Aquatics C-VUE 26 16 페이지. Aquarium and integrated filtration system
Cobalt Aquatics C-VUE 26에 대해서도 마찬가지입니다: 사용 및 관리 지침 매뉴얼 (12 페이지)

Cobalt Aquatics C-VUE 26 조립 지침 매뉴얼
C-VUE 18, 26, 45 ASSEMBLY INSTRUCTIONS
Step 1- Attaching Right Side Panel to Back Panel
[requires two (2) Camlocks and two (2) Camlock Screws]
• Insert two (2) Camlock Screws into the Right Side Panel.
• Be sure to screw in just until the threads are not visible, no more.
• Insert two (2) Camlocks into the Back Panel
• Attach Right Side Panel into the Back Panel
• Tighten Camlocks to secure the Right Side Panel to Back Panel.
• If cam will not engage during assembly, then you must unscrew the
camlock screw slightly until the head of the screw and engage with
cam.
3