Aktobis WDH-50B 매뉴얼 - 페이지 6

{카테고리_이름} Aktobis WDH-50B에 대한 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. Aktobis WDH-50B 10 페이지. Building dryer

Aktobis WDH-50B 매뉴얼
Instructions for use:
1. Commissioning
Insert the mains plug properly into the socket.
Switch on the unit with the main switch ( I / O ).
The unit is programmed so that the building dryer runs in continuous operation (continuous dehumidification). This
means that you do not have to make any further settings.
Switch the unit off again with the main switch ( I / O ) if dehumidification is no longer required.
Operating instructions
After switching on the unit, the main switch lights up automatically.
To protect the compressor, the unit should always run for at least 3 minutes or be switched off before you press the
main switch ( I / O ) again!!!
In case of cold ambient temperatures or icing in the unit, a sensor automatically controls a defrosting process.
Meanwhile, the defrost mode automatically controls the air circulation and compressor operation !
2. Connecting a hose
2.1 The connection point for the drain hose is on the right-hand side of the condensation tank (see diagram below).
First remove the black sealing plug there.
2.2 It is best to use a ½ inch plastic hose and pass it through the hole provided on the side and then put the hose
over the plastic tap provided.
2.3 Make sure that it fits properly. For safety, we recommend fixing the hose with a clamp/clip !
2.4 Make sure that the hose does not kink and must always have a slight slope !
Aktobis AG, Borsigstr. 20, D-63110 Rodgau / Germany
www.AKTOBIS.de

Condensation tank

Plastic tap
Sealing plug
Side hose hole