BARLOW TYRIE 9111210 조립 지침 매뉴얼 - 페이지 15

{카테고리_이름} BARLOW TYRIE 9111210에 대한 조립 지침 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. BARLOW TYRIE 9111210 16 페이지. Pavilion with cabrio folding roof

Installing the curtains
14
Metallic
Eyelet
Curtain
(Exterior Side)
025
15
Velcro Strips
Bottom Groove
16" apart
www.teak.com
PL101
Plastic Pulley
Zipper
(Interior Side)
Profile View
Roof fabric and valence
not shown for clarity
(installed using velcro strips
on bottom beam groove)
The decorative curtains are installed using velcro strips
16" apart in the bottom groove of the beams similarly to the valance
in step 13. If you have purchased optional curtains (mesh netting,
transparent plastic or acrylic fabric) install them on the inside or
outside rail of the beams.
BA R LO W T Y R I E
Snap Pulley
in place
( PL101 )
Install plastic pulleys
curtain eyelet. Use long nose pliers to facilitate this operation.
Pulleys should be facing towards the curtain side on which the
zipper is located (see above steps). Then install each curtain
sections into the provided beam slots as shown by left hand
diagram. After installing all pulleys, block the access with the
( 025 )
screws
as shown in the diagram. Repeat step for each
corner. See next step (15) for curtain installation example
Curtain Type
Decorative curtains
Mosquito curtains
Acrylic curtains
Plastic curtains
outside rail
curtains on inside rail
curtains on outside rail
decorative curtains
quality since 1920
Curtain
Exterior Side
by snapping them in each metallic
Rail
Inner or Outer
Inner
Outer
Inner or Outer
inside rail
TOP VIEW
( R3 )
inserted
Page 15 of 16