Both a check valve and a shut-off
valve are recommended for each
pump. The check valve is used to
prevent backflow into the sump. The
shut-off valve is used to manually
stop system low during pump
servicing.
4Electrical Connections
Power cable:
The power cable mounted to the
pump must not be modified in any
way except for shortening to a
specific
application.
between the pump and the control
panel must be made in accordance
with
the
electric
recommended that a junction box, if
used, be mounted outside the sump
or be of at a minimum Nema 4
construction if located within the wet
well. DO NOT USE THE POWER
barmesa.com
CABLE TO LIFT PUMP.
Always
rely
upon
Electrician for installation.
Overload Protection:
Single Phase - The stator in-winding
overload protector used is referred to
as an inherent overheating protector
and operates on the combined effect
of temperature and current.
This
means
that
protector will trip out and shut the
pump off if the windings become too
hot, or the load current passing
through them becomes too high.
IMPORTANT! - The overload will then
automatically reset and start the
pump up after the motor cools to a
safe temperature. In the event of an
overload, the source of this condition
should be determined and corrected
immediately.
WARNING
PUMP TO CYCLE OR RUN IF AN
OVERLOAD CONDITION OCCURS.
If current through the temperature
sensor exceeds the values listed, an
intermediate control circuit relay
must be used to reduce the current
or the sensor will not work properly.
TEMPERATURE SENSOR ELECTRICAL
Volts
Any
splice
110-120
220-240
codes.
It
is
Wire Size:
If longer power cable is required
consult a qualified electrician for
proper wire size.
4Pre-Operation
1.   Check Voltage and Phase -
a
Certified
Compare the voltage and phase
information stamped on the
pump name plate.
2.   Check Pump Rotation - Improper
motor rotation can result in poor
pump performance and can
damage the motor and/or pump.
Incorrect rotation for Single-Phase
pumps is unlikely. If the rotation is
incorrect contact factory.
the
overload
3.   Name
information from the pump name
plate to drawing in front of
manual for future reference.
4.   Insulation Test - An insulation
(megger)
performed on the motor. Before
the pump is put into service. The
resistance values (ohms) as well
as the voltage (volts) and current
(amps) should be recorded.
DO NOT ALLOW THE
RATINGS
Continuous
Inrush
Amperes
Amperes
3.00
30.0
1.50
15.0
Plate
-
Record
the
test
should
be
Installation & Service
5.   Pump-Down Test - Be sure pump
has been properly wired, lowered
into the basin, sump or lift station,
check the system by filling with
liquid and allowing the pump to
operate through its pumping
cycle. The time needed to empty
the system, or pump-down time
along with the volume of water,
should be recorded.
4Maintenance
No lubrication or maintenance is
required.
Perform
the
checks when pump is removed from
operation
or
when
performance deteriorates:
a)   Inspect motor chamber for oil
level and contamination.
b)   Inspect impeller and body for
excessive build-up or clogging.
c)   Inspect motor, bearings and shaft
seal for wear or leakage.
4Servicing
Cooling Oil - Anytime the pump is
removed from operation, the cooling
oil in the motor housing should be
checked visually for oil level and
contamination.
To check oil, set unit upright. Remove
pipe plug from housing. With a
flashlight, visually inspect the oil in
the housing to make sure it is clean
and clear, light amber in color and
free from suspended particles. Milky
white oil indicates the presence of
water. Oil level should be just above
the motor when pump is in vertical
position.
Oil Testing
Ÿ
Drain oil into a clean, dry
container by placing pump on
it's side, remove pipe plug, from
housing.
Check oil for contamination
Ÿ
using an oil tester with a range
to 30 kilovolts breakdown.
following