Da-Lite Tensioned Advantage Deluxe Electrol 지침서 - 페이지 3
{카테고리_이름} Da-Lite Tensioned Advantage Deluxe Electrol에 대한 지침서을 온라인으로 검색하거나 PDF를 다운로드하세요. Da-Lite Tensioned Advantage Deluxe Electrol 12 페이지. Automatic electric projection screen
Da-Lite Tensioned Advantage Deluxe Electrol에 대해서도 마찬가지입니다: 사양 (2 페이지), 사양 (2 페이지), 지침서 (12 페이지)
SCREEN AND ROLLER ASSEMBLY INSTALLATION
If your screen was shipped with the motor and roller already installed proceed to step 6.
1. Remove the screw from each end of the access door (front door) and open the door. See figure 1.
2. Carefully unpack screen and roller assembly. Leave packing paper on the roller.
3. Place the roller assembly into the case with the motor on the left side. The limit switches should be facing down.
Line up the square pin on the motor with the square hole in the bracket.
4. Lift the pin end (right end) of the roller into position and slide the bracket onto the roller pin. Tighten two nuts to
secure the bracket.
5. Complete electrical hook-up by snapping motor wire connector into case connector.
6. Remove shipping brackets by removing the hex head screws from aluminum slat and case. Slat should move
freely. See figure 2. (Only if the roller assembly is preinstalled.)
7. Test installation by operating the screen several times. Be prepared to stop the screen. Standard Duty Cycle: 1
MIN. ON/3 MIN. OFF. The fabric door (rear door) will not close until the wall switch is placed in the up position and
when the screen motor stops at its limit switch in the up direction.
NOTE: Excessive continuous operation may cause the motor to overheat. If this happens the motor will shut off until it cools to
a normal operating temperature.
8. Run the screen down enough to open the fabric door. Close the access door and reinstall the screws to secure the
door.
screen motor
WHITE
ADJUSTMENT
KNOB "DOWN"
BLACK
ADJUSTMENT
KNOB "UP"
DOOR
MICROSWITCH
door motor
HEx HEAD SCREWS
SCREEN ADJUSTMENT
s
!
CONTACT DA-LITE AT 800-622-3737 OR 574-267-8101 IF SCREEN OR DOOR MOTOR NEEDS ADjUSTMENT.
SHIPPING
BRACKET
FIGURE 2
FABRIC
DOOR
CONDUIT INSTALLATION
2
ACCESS DOOR
SCB-100/SCB-200
ACCESS COvER
KNOCKOUTS FOR
FIGURE 3