Ekinex EK-EB2-TP 매뉴얼 - 페이지 3

{카테고리_이름} Ekinex EK-EB2-TP에 대한 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. Ekinex EK-EB2-TP 4 페이지. Pushbutton 6-fold

Ekinex EK-EB2-TP 매뉴얼
i
Note. Programming pushbutton and LED are only
accessible from the rear side of the device. It is bet-
ter addressing the device before the final assem-
bly of rockers and frame. Once the addressing has
been performed, the device configuration can be la-
ter downloaded without pressing the programming
pushbutton.
Elementi di segnalazione
• LED red (1) for indication of the active operating mode
(on = programming, off = normal operation)
• Green and blue LED freely programmable e.g. for
feedback status and orientation nightlight
Connection of the KNX bus line
The connection of the KNX bus line is made with the ter-
minal block (black/red) included in delivery and inserted
into the slot of the housing.
Characteristics of the KNX terminal block
• spring clamping of conductors
• 4 seats for conductors for each polarity
• terminal suitable for KNX bus cable with single-wire
conductors and diameter between 0.6 and 0.8 mm
• recommended wire stripping approx. 5 mm
• color codification: red = + (positive) bus conductor,
black = - (negative) bus conductor
!
Warning! In order to supply the KNX bus lines use
only KNX bus power supplies (e.g. ekinex EK-AB1-
TP or EK-AG1-TP). The use of other power supplies
can compromise the communication and damage
the devices connected to the bus.
+
Bus
KNX
-
!
Warning! The electrical connection of the device
can be carried out only by qualified personnel. The
incorrect installation may result in electric shock or
fire. Before making the electrical connections, make
sure the power supply has been turned off.
Configuration and commissioning
Configuration and commissioning of the device require
the use of the ETS
(Engineering Tool Software) program
®
V4 or later releases. These activities must be carried out
according to the design of the building automation system
done by a qualified planner.
i
Note. The configuration and commissioning of KNX
devices require specialized skills. To acquire these
skills, you should attend the workshops at KNX cer-
tified training centers.
Configuration
For the configuration of the device parameters the corre-
sponding application program or the whole ekinex
duct database must be loaded in the ETS program. For
detailed information on configuration options, refer to the
application manual of the device available on the website
www.ekinex.com.
Product
Application program
code
(## = release)
EK-EB2-TP
APEKEB2TP##.knxprod
Commissioning
For commissioning the device the following activities are
required:
• make the electrical connections as described above;
• turn on the bus power supply;
• switch the device operation to the programming mode
by pressing the programming pushbutton located on
the rear side of the housing. In this mode of operation,
the programming LED is turned on;
• download into the device the physical address and the
configuration with the ETS
At the end of the download the operation of the device
automatically returns to normal mode; in this mode the
programming LED is turned off. Now the bus device is
programmed and ready for use.
Dimensions [mm]
122,0
Marks
• KNX
• CE: the device complies with the Low Voltage Directi-
ve (2006/95/EC) and the Electromagnetic Compatibility
Directive (2004/108/EC). Tests carried out according to
EN 50491-5-1:2010, EN 50491-5-2:2010
Maintenance
The device is maintenance-free. To clean use a dry cloth.
It must be avoided the use of solvents or other aggressive
substances.
3
pro-
®
Communica-
Group
tion objects
adresses
(max nr.)
(max nr.)
232
254
program.
®
34,8
28,5
6,3