DAB FEKAFOS 280 설치 설명서 지침 - 페이지 12
{카테고리_이름} DAB FEKAFOS 280에 대한 설치 설명서 지침을 온라인으로 검색하거나 PDF를 다운로드하세요. DAB FEKAFOS 280 19 페이지.
Fekafos 280 - Fekafos 280 Double - Fekafos 550 Double:
For the parts references, see the diagram on page 44-45
The Fekafos range is equipped with a 2" cast iron lowering device and is therefore intended for use with one
or two non automatic single-phase pumps (Double models) or three-phase without float, which must be
installed in combination with a control panel.
A. Remove the tank cover.
B. FEKA VS-VX:
Check that the length of the pump float is 250 mm (see page 41, fig 8A).
Remove the top screw from the flange on the delivery side (1).
Assemble the anti-rotation bracket (2).
Replace the screw (1).
Extract the slide from the coupling foot (5) and connect it to the delivery port of the pump. Using
the screw (6) and the nut (4), fix the slide to the pump as indicated in the figure 9.
C. GRINDER 1400-1800: Extract the slide from the coupling foot (5) and connect it to the delivery port of
the pump: using the screw (6) M10X25
D. OTHER PUMPS (list in table page 44-45). Extract the slide (3) from the coupling foot (5) and connect it
to the delivery outlet by means of the threaded flange supplied with the pump.
E. Reposition the slide/pump assembly on the foot (5).
Feka VS-VX
1
4
5
Fig. 9
ENGLISH
2
3
47
6