DoorHan SECTIONAL-500PRO 설치 및 운영 매뉴얼 - 페이지 6
{카테고리_이름} DoorHan SECTIONAL-500PRO에 대한 설치 및 운영 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. DoorHan SECTIONAL-500PRO 18 페이지. Operator
4. OPERATOR INSTALLATION
4.1. TOOLS
1.
Set of spanners
2.
Set of slotted and cross screwdrivers
3.
Set of drills for metal
4.2. REQUIRMENTS TO DOOR INSTALLATION
P rior to installation check if the door is
properly balanced and moves smoothly when
automatically operated.
M ake sure, that minimal clearance between
the ceiling and the top point, when the door is
moving, is not less than 45 mm (pic. 1).
C heck, that the door leaf top roller is in the
horizontal part of the guide rail, when the door
is completely closed (pic. 2).
M ount the door control panel at a height not less
than 1.5 m close to the door.
4.3. CONNECTION OF OPERATOR AND GUIDE
1. Put the operator bushing (4) on the shaft (5).
2. I nsert the operator unit into the hole on the
guide (3).
3. F asten the operator with U-brackets (2) and
tapping screws (1).
1.
2.
3.
4.
5.
6
4.
Set of drills for concrete
5.
Pliers
6.
Hacksaw for metal
Tapping screws
U-bracket
Guide
Bushing
Motor shaft
7.
Electric drill
8.
Tape measure (folding rule)
45 mm
Pic. 1
OPERATOR INSTALLATION
Pic. 2
1
2
3
4
5