4. OPERATOR INSTALLATION
4.1. TOOLS
1. Set of spanners
2. Set of slotted and cross screwdrivers
3. Set of drills for metal
4.2. REQUIRMENTS TO DOOR INSTALLATION
1. Prior to installation check if the door is properly balanced and moves smoothly when automatically operated.
2. Make sure, that minimum clearance between the ceiling and the top point, when the door is moving, is not less than
45 mm (fig. 1).
3. Check, that the door leaf top roller is in the horizontal part of the guide rail, when the door is completely closed (fig. 2).
FIG. 1
4.3. CONNECTION OF OPERATOR AND GUIDE
1. Put the operator bushing (3) on the shaft (6).
2. Loosely tighten the drive mounting screws (7).
3. Insert the operator unit into the hole on the guide (2).
4. Fasten the operator with U-brackets (1) and tapping screws (7).
FIG. 1
1. U-Bracket
2. Guide
3. Bushing
6
4. Set of drills for concrete
5. Pliers
6. Hacksaw for metal
FIG. 2
45 mm
4. Plug terminals for connection of accessories
5. Micro-switch reference point
6. Motor shaft
OPERATOR INSTALLATION
7. Electric drill
8. Tape measure (folding rule)
1
2
3
4
5
6
7
7. The drive mounting screws